Novant Health Charlotte Orthopedic Hospital presents a new installation tower

0


Novant Health orthopedic hospital.

In numbers :

1 There is a Starbucks kiosk in the new facility tower.

3 Number of floors in the new facility tower.

84,000 Pipe feet in the new installation tower.

170,000 Number of pounds of steel used to build the new tower.

250,000 Square feet of paint used in the new tower installation.

Novant Health Charlotte Orthopedic Hospital unveiled its new facility tower with a ribbon cutting, tours and community open house last week.

Novant Health celebrated their new installation with a ribbon cut.

Novant Health unveiled on October 5 the completion of its new three-story, 89,000 square foot facility tower at its existing Charlotte Orthopedic Hospital. The nearly 46-year-old facility, located at 1901 Randolph Road on the corner of Fifth Street and Caswell Road, is the only hospital in the region entirely dedicated to orthopedics and the spine and is one of the few in its kind in the country.

The first operation is scheduled for October 16.

“Novant Health Charlotte Orthopedic Hospital has a long history of providing innovative, world-class orthopedic care to residents of Charlotte and surrounding communities,” said Jason Bernd, vice president of Novant Health Charlotte Orthopedic Hospital. “This new state-of-the-art facility tower continues this tradition by allowing us to modernize our facilities to reflect the caliber of specialized care provided by our staff and physicians.

Patient room in the new facility.

With the completion of the tower, Charlotte Orthopedic Hospital now has 48 patient beds. In addition, the facility’s new tower houses seven state-of-the-art operating theaters, a rehabilitation gymnasium, a preoperative wellness unit and a new sterile treatment department.

“We have really worked to create a very safe and high quality environment for our patients,” said Michele Gobble, director of nursing at Charlotte Orthopedic Hospital. “The building incorporates quality and safety features such as UV lamps in the air duct system, antimicrobial paint throughout the facility, and silver infused hardware to destroy bacteria and susceptible microorganisms. cause infections.

Architects’ drawing of the new facility.

“In Charlotte, it is important to meet the needs of our community. High quality and safe care is very important. We have worked to have a very safe environment for our patients. “

Amenities for patients and guests include valet parking, a Starbucks kiosk, free Wi-Fi, comfortable waiting rooms for family and friends, wide doors and hallways for wheelchairs and walkers , and spacious, private patient rooms that include a sofa bed for an overnight guest.

Charlotte Orthopedic Hospital is ranked among the top hospitals in the country for surgical care and orthopedic programs. Orthopedic surgeons use the latest surgical techniques, including robotic technology for spine and joint replacement. Radiologists use the most sophisticated technology, such as 3D imaging, to diagnose conditions.

Operating room of the new establishment.

Originally developed as a long-term care facility in 1971, the building transformed into a dedicated orthopedic hospital in 1976. Today, Novant Health Charlotte orthopedic hospital offers care and services in the areas of arthroplasty total, spine surgery, foot and ankle surgery, shoulder and ankle surgery. elbow surgery, hand and wrist surgery and sports medicine. The surgeons, which include partner physicians from Novant Health Orthopedics and Sports Medicine and OrthoCarolina, are board certified and specialized or trained in orthopedic surgery and are supported by a care team with advanced orthopedic training.

The hospital has won some of the country’s top honors for quality care, including the Joint Commission Seal of Approval for Advanced Certification for five of its joint and spine programs: Total Knee Replacement , total hip arthroplasty, hip fracture, vertebral laminectomy and spinal fusion. . It was named in the Becker’s Hospital Review as one of the country’s “Top 100 Orthopedic Hospitals” in 2015 and 2016, and ranked by CareChex as 33rd in the country for medical excellence in orthopedic surgery in 2017.

A cake in the shape of a new installation.

The facilities tower is the first phase of a total renovation of the hospital. The second phase will involve the renovation of 85,000 square feet of existing space for a new outpatient surgery center that will open in August 2018. The renovation of the entire hospital is expected to be completed by the end of 2018. Vannoy Construction is the general contractor for the projects. and Wright McGraw Beyer Architects is behind the design.

In 2016, Charlotte Orthopedic Hospital performed 7,481 surgical cases. The hospital employs 300 healthcare team members.


Share.

About Author

Leave A Reply